2/21/2024 0 Comments Demolition instal the newWall ties should be inspected and evaluated for integrity. Inspect electrical junction boxes for debris or mud, as it often can accumulate in the lower areas of the walls. Plumbing and electrical lines will have pressure applied to them as the demolition process takes place and can result in the need to tighten and reconnect fittings. The second important step is to inspect all wiring connections and plumbing lines within the interior of the walls prior to reconstruction. The incremental measurements will reduce material waste, simplify cutting and make the project easier to compute required materials. One step that can be performed is to remove damaged materials vertically in 2-foot increments and 6 inches above the highest recorded water level. There are a few steps that can be taken to shorten reconstruction time. Any products that are used to prevent mold would be applied now, along with fans to assist drying remaining materials. Once the bulk material is removed from the wall, the sheathing that is remaining between the wall ties and the studs, as well as mortar droppings at the base of the wall are removed. After removal of the damaged materials, the drywall, polyethylene (if present), batt insulation, exterior sheathing and any rigid insulation that may exist is pulled through the studs and properly disposed of. The process begins with eliminating water and electrical supply to the areas where work will be performed to allow the safe removal of all wet and damaged building materials from the inside of the structure.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |